Develop a Work Breakdown Structure (WBS) and project schedule in a Gantt format for the E-Mail Upgrade Project described in the scenario.The WBS and resultant schedule should contain the following high-level activities:
- 1.0 Evaluate User & System Requirements
- 2.0 Evaluate ODHS Network Suitability
Save your time - order a paper!
Get your paper written from scratch within the tight deadline. Our service is a reliable solution to all your troubles. Place an order on any task and we will take care of it. You won’t have to worry about the quality and deadlines
Order Paper Now- 3.0 Conduct E-mail System Selection
- 4.0 Upgrade ODHS Network & Hardware
- 5.0 Develop E-mail Training
Each of the six WBS elements should be decomposed into two or more activities; additionally, three of these six elements should be decomposed into a third level consisting of at least two more activities. Thus, there should be six high level WBS elements, twelve or more second level activities (two per the six elements), and six third level activities. Use the format described above to define the activities (action verb followed by subject, such as Deploy E-mail System).
The Gantt chart should be developed based on the WBS (all activities should be detailed on the Gantt chart). The Gantt chart should reflect the proper dependencies of each of the activities (for example, you can’t have “Deploy E-mail System” before “Evaluate User Requirements”). For activity duration, provide a reasonable estimate of the time you expect each activity to take; while students are not expected to provide accurate durations, durations should be reasonably defensible and logical. For formatting ease, high level activities should be left justified while second and third level activities should be indented below their parent activities.